(TS//SI) BRECKENRIDGE for STORMBREW Collection By [REDACTED] on 2009-10-28 1035 7 October 2009 (TS//SI//NF) STORMBREW has completed SCIF construction and also received security certification for BRECKENRIDGE, its latest collection site on 11 September 2009. The 10,000 square foot facility is equipped with the necessary power, communications and equipment racks to support the planned near-term deployment of 15 TURMOIL systems, providing 150G of processing against the newly acquired [REDACTED] The results of a recent signal survey, conducted by SSO, indicates a potentially rich target environment of both DNI and DNR. Initial collection system deployments are scheduled for 2nd quarter 2010. The BRECKENRIDGE/[REDACTED] effort commenced in February 2007 and is the first "cable-head" collection effort conducted under STORMBREW. (U//FOUO) POC: [REDACTED], Deputy PD STORMBREW, [REDACTED].