59 lines
2.1 KiB
JSON
59 lines
2.1 KiB
JSON
{
|
||
"title": "New Operations Building at MHS Completed, Fit-Up Begins",
|
||
"type": "SIDTODAY",
|
||
"description": "A 2011 NSA internal report describes the completion of “Project Phoenix” at Menwith Hill Station in the UK — a new operations building featuring a state-of-the-art data center, auditorium, and collaborative office spaces designed to enhance mission resilience, technological capacity, and training infrastructure. The project marks a major modernization effort, expanding Menwith Hill’s operational footprint and preparing it to support new intelligence systems and missions.",
|
||
"long_description": "",
|
||
"tags": [
|
||
"Phoenix",
|
||
"Project Phoenix",
|
||
"MHS",
|
||
"Menwith Hill",
|
||
"operations building",
|
||
"data centers",
|
||
"intelligence infrastructure",
|
||
"mission engineering",
|
||
"civil engineering",
|
||
"cooling",
|
||
"collaborative workspace",
|
||
"education",
|
||
"modernization",
|
||
"facility expansion",
|
||
"operations compound",
|
||
"refurbishment",
|
||
"intelligence base",
|
||
"surveillance infrastructure",
|
||
"strategic base"
|
||
],
|
||
"document": {
|
||
"creator": "NSA",
|
||
"date_created": "2011-08-09",
|
||
"classification": [
|
||
"TOP SECRET",
|
||
"SI",
|
||
"TK"
|
||
],
|
||
"dissemination": [
|
||
"REL TO USA AUS CAN GBR NZL"
|
||
],
|
||
"banner": "DYNAMIC PAGE -- HIGHEST POSSIBLE CLASSIFICATION IS TOP SECRET // SI / TK // REL TO USA AUS CAN GBR NZL",
|
||
"genre": "newsletter",
|
||
"programs": [],
|
||
"countries": [],
|
||
"people": []
|
||
},
|
||
"publication": [
|
||
{
|
||
"publisher": "The Intercept",
|
||
"date_published": "2016-09-06",
|
||
"title": "Inside Menwith Hill: The NSA’s British Base at the Heart of U.S. Targeted Killing",
|
||
"link": "https://theintercept.com/2016/09/06/nsa-menwith-hill-targeted-killing-surveillance/",
|
||
"reporters": [
|
||
"Gallagher, Ryan"
|
||
],
|
||
"contributors": [],
|
||
"doc_url": "https://s3.documentcloud.org/documents/3089515/New-ops-building-at-MHS-completed-fit-up-begins.pdf"
|
||
}
|
||
],
|
||
"pdf_sha256": "94a9fbb725c117dd4ce08fa23f496b8dbaa847b325836c2c28ae85d9e1570f1d",
|
||
"pages": 2
|
||
}
|