# Bagram - Area 82
|
||||
The Story So Far.....
|
||||
|
||||
23 June 2010
|
||||
SECRET
|
||||
|
||||
---
|
||||
|
||||
## Introduction
|
||||
|
||||
* [REDACTED] (GREMIO ASI PM)
|
||||
* Technical delivery by IT Services with help from C&W
|
||||
* This is a summary of how we got there, including:
|
||||
* 2 winters (neither really happened)
|
||||
* 5+ external partners
|
||||
* 1 minefield with added bomb and
|
||||
* 1 toilet block
|
||||
|
||||
23 June 2010
|
||||
SECRET
|
||||
|
||||
---
|
||||
|
||||
## Why did we build this facility?
|
||||
* GCOs wanted access to RT-RG
|
||||
* RT-RG was based at Bagram Airfield and effective access required:
|
||||
* Single satellite hop connectivity
|
||||
* Requiring A new in theatre network
|
||||
* Requiring In-theatre peering with NSA
|
||||
|
||||
RT-RG: REAL-TIME
|
||||
REGIONAL GATEWAY
|
||||
Bagram Airbase, Afghanistan - AF1
|
||||
RT
|
||||
|
||||
23 June 2010
|
||||
SECRET
|
||||
|
||||
---
|
||||
|
||||
## Where we started
|
||||
|
||||
* Container based solution at Souter
|
||||
* Fit a peering point into 1 container (5 racks)
|
||||
* Try to link this all to RT-RG at Bagram
|
||||
* Winter was approaching and there was a risk of bad weather / frozen ground.
|
||||
|
||||
23 June 2010
|
||||
SECRET
|
||||
|
||||
---
|
||||
|
||||
## Area-82 was still just a good idea
|
||||
|
||||
23 June 2010
|
||||
SECRET
|
||||
|
||||
---
|
||||
|
||||
## Then came the Minefield
|
||||
|
||||
* Space available on Area 82 – if we don't mind it being in a minefield.
|
||||
* Oh, and by the way - there is a 500lb unexploded bomb in the middle of it.....
|
||||
* Souter not an option
|
||||
* Area-82 becoming a building site
|
||||
* Still in containers
|
||||
|
||||
```
|
||||
02/23/2009
|
||||
```
|
||||
|
||||
23 June 2010
|
||||
SECRET
|
||||
|
||||
---
|
||||
|
||||
## Then came the data centre move
|
||||
|
||||
* RT-RG moving into new data centre so our plans delayed once more
|
||||
* Space available for our racks and plans to clear the minefield are drawn up
|
||||
|
||||
23 June 2010
|
||||
SECRET
|
||||
|
||||
---
|
||||
|
||||
## Area-82 was also changing fast
|
||||
|
||||
```
|
||||
SMO
|
||||
Afghan campaign
|
||||
BAGRAM AIRFIELD
|
||||
A-ROCC
|
||||
Afghanistan
|
||||
Remote Operations Cryptologic Center
|
||||
RT-RG
|
||||
Building
|
||||
Billeting --Living Pods
|
||||
Billeting --Living Pods
|
||||
EITS
|
||||
IT Services
|
||||
Building
|
||||
Billeting --Living Pods
|
||||
NGA
|
||||
NGA
|
||||
Office
|
||||
Warehouse
|
||||
|
||||
Primary Power Feeder 16
|
||||
UDAEUS
|
||||
HF/DF
|
||||
ANTENNA ARRAY
|
||||
Red Ridge Antenna
|
||||
Proposed 2nd
|
||||
Power Feeder
|
||||
15
|
||||
AREA 82
|
||||
AIR FORCE
|
||||
NGA
|
||||
SATELLITE FARM
|
||||
72 ANTENNAS
|
||||
NRO
|
||||
242.2 | 25.6 207 145.3
|
||||
PP
|
||||
(2) GCHQ 3.8 M
|
||||
ACCESS ROAD
|
||||
GCHQ ET ALL
|
||||
ANTENNA NUMBERS
|
||||
AND PLACEMENTS ARE
|
||||
```
|
||||
|
||||
23 June 2010
|
||||
SECRET
|
||||
|
||||
---
|
||||
|
||||
## "The Minefield is Cleared"
|
||||
|
||||
* All we needed was a volunteer to go check out this rumour
|
||||
|
||||
[REDACTED]
|
||||
02/24/2008
|
||||
|
||||
23 June 2010
|
||||
SECRET
|
||||
|
||||
---
|
||||
|
||||
## Then the other guests turned up
|
||||
|
||||
* First the AROCC build started
|
||||
* Then RED RIDGE appeared in the antenna field
|
||||
* Then Liberty.....
|
||||
* Then NRO.....
|
||||
* Then NGA.....
|
||||
* Then USAF....
|
||||
* Let the party begin.
|
||||
* Who pays?
|
||||
* How do we design the layout?
|
||||
* Any more partners? Have we enough power?
|
||||
* Winter was approaching again - along with the risk.
|
||||
* Do we want temporary space on top of the toilets?
|
||||
|
||||
02/24/2008
|
||||
|
||||
23 June 2010
|
||||
SECRET
|
||||
|
||||
---
|
||||
|
||||
## Another Survey is needed
|
||||
|
||||
02/24/2008
|
||||
But the Bagram Hilton is overbooked that night...
|
||||
|
||||
23 June 2010
|
||||
SECRET
|
||||
|
||||
---
|
||||
|
||||
## Progress was being made
|
||||
|
||||
2009/11/25
|
||||
We finally have our very own hole!!
|
||||
|
||||
23 June 2010
|
||||
SECRET
|
||||
|
||||
---
|
||||
|
||||
## Quite Quickly by this point...
|
||||
|
||||
2009/12/03
|
||||
Which soon started to look like something we could use
|
||||
|
||||
23 June 2010
|
||||
SECRET
|
||||
|
||||
---
|
||||
|
||||
## Finally the Build Begins
|
||||
|
||||
[REDACTED]
|
||||
Afghan technology is deployed to complete the ground works
|
||||
|
||||
23 June 2010
|
||||
SECRET
|
||||
|
||||
---
|
||||
|
||||
## No Expense is Spared
|
||||
|
||||
[REDACTED]
|
||||
Only the best equipment is used
|
||||
|
||||
23 June 2010
|
||||
SECRET
|
||||
|
||||
---
|
||||
|
||||
## Meanwhile, back with ITServices
|
||||
|
||||
2009/11/20
|
||||
We managed to get our hands on a plane!!
|
||||
|
||||
23 June 2010
|
||||
SECRET
|
||||
|
||||
---
|
||||
|
||||
## Somewhere is Sunny Afghanistan
|
||||
|
||||
2010/02/08
|
||||
Not quite the 46° that had been promised
|
||||
|
||||
23 June 2010
|
||||
SECRET
|
||||
|
||||
---
|
||||
|
||||
## C&W were building the Dishes
|
||||
|
||||
2010/01/28
|
||||
One man and his power tools :)
|
||||
|
||||
23 June 2010
|
||||
SECRET
|
||||
|
||||
---
|
||||
|
||||
## Whilst in a warm(er) data centre
|
||||
|
||||
2009/12/02
|
||||
GCHQ
|
||||
2009/12/02
|
||||
All those wires needed putting back in the right place
|
||||
|
||||
23 June 2010
|
||||
SECRET
|
||||
|
||||
---
|
||||
|
||||
## And finally it all came together
|
||||
|
||||
[REDACTED]
|
||||
2010/02/10
|
||||
A well earned photo opportunity for the team
|
||||
|
||||
23 June 2010
|
||||
SECRET
|
||||
|
||||
---
|
||||
|
||||
## RT-RG Deploys
|
||||
|
||||
* Same 5 rack solution that we started with 18 months earlier
|
||||
* 3/ 4 spoke sites configured at IOC
|
||||
* Final desktop issues resolved and so far the deployment has been a big success.
|
||||
|
||||
We Are Here
|
||||
|
||||
23 June 2010
|
||||
SECRET
|
||||
|
||||
---
|
||||
|
||||
## Area 82 today
|
||||
|
||||
Very different from when we started 18 months ago
|
||||
|
||||
23 June 2010
|
||||
SECRET
|
||||
66
data/Bagram-Build/metadata.json
Normal file
66
data/Bagram-Build/metadata.json
Normal file
|
|
@ -0,0 +1,66 @@
|
|||
{
|
||||
"title": "Bagram – Area 82",
|
||||
"type": "REPORTED",
|
||||
"description": "This document is a classified June 2010 progress report on the construction of the NSA’s Real Time Regional Gateway (RT-RG) data center at Area 82, Bagram Airfield, coordination with multiple U.S. and allied agencies, and the eventual deployment of the system after extensive infrastructure work. It emphasizes the transition from temporary container setups to a permanent facility enabling real-time signals intelligence in Afghanistan.",
|
||||
"long_description": "",
|
||||
"tags": [
|
||||
"Bagram",
|
||||
"Area 82",
|
||||
"facilities",
|
||||
"GCHQ",
|
||||
"satellite",
|
||||
"containers",
|
||||
"construction",
|
||||
"data centers",
|
||||
"building"
|
||||
],
|
||||
"document": {
|
||||
"creator": "NSA",
|
||||
"date_created": "2010-06-23",
|
||||
"classification": [
|
||||
"SECRET"
|
||||
],
|
||||
"dissemination": [],
|
||||
"banner": "SECRET",
|
||||
"genre": "slides",
|
||||
"programs": [
|
||||
"GREMIO",
|
||||
"RT-RG"
|
||||
],
|
||||
"countries": [
|
||||
"Afghanistan"
|
||||
],
|
||||
"people": []
|
||||
},
|
||||
"publication": [
|
||||
{
|
||||
"publisher": "The Intercept",
|
||||
"date_published": "2019-05-29",
|
||||
"title": "Mission Creep: How the NSA’s Game-Changing Targeting System Built for Iraq and Afghanistan Ended Up on the Mexico Border",
|
||||
"link": "https://theintercept.com/2019/05/29/nsa-data-afghanistan-iraq-mexico-border/",
|
||||
"reporters": [
|
||||
"Moltke, Henrik"
|
||||
],
|
||||
"contributors": [],
|
||||
"doc_source": "https://theintercept.com/document/2019/05/29/gchq-bagram-presentation-2010/",
|
||||
"doc_url": "https://s3.documentcloud.org/documents/6061133/Bagram-Build.pdf"
|
||||
},
|
||||
{
|
||||
"publisher": "NRK",
|
||||
"date_published": "2019-05-29",
|
||||
"title": "Norges hemmelige krig i Afghanistan",
|
||||
"link": "https://www.nrk.no/dokumentar/xl/norges-hemmelige-krig-i-afghanistan-1.14539055",
|
||||
"reporters": [
|
||||
"Skille, Øyvind Bye",
|
||||
"Døvik, Olav",
|
||||
"Hansen, Ståle Ellingsgard",
|
||||
"Fjørtoft, Martin"
|
||||
],
|
||||
"contributors": [],
|
||||
"reporting_only": true
|
||||
}
|
||||
],
|
||||
"aka_id": [],
|
||||
"pdf_sha256": "e5180fe2a89b5cc2b3d63955f2a855e0adc5ba0e7e983607bf7a0b99ccd99cb0",
|
||||
"pages": 22
|
||||
}
|
||||
Loading…
Add table
Add a link
Reference in a new issue