# Bagram - Area 82
The Story So Far.....
23 June 2010
SECRET
---
## Introduction
* [REDACTED] (GREMIO ASI PM)
* Technical delivery by IT Services with help from C&W
* This is a summary of how we got there, including:
* 2 winters (neither really happened)
* 5+ external partners
* 1 minefield with added bomb and
* 1 toilet block
23 June 2010
SECRET
---
## Why did we build this facility?
* GCOs wanted access to RT-RG
* RT-RG was based at Bagram Airfield and effective access required:
* Single satellite hop connectivity
* Requiring A new in theatre network
* Requiring In-theatre peering with NSA
RT-RG: REAL-TIME
REGIONAL GATEWAY
Bagram Airbase, Afghanistan - AF1
RT
23 June 2010
SECRET
---
## Where we started
* Container based solution at Souter
* Fit a peering point into 1 container (5 racks)
* Try to link this all to RT-RG at Bagram
* Winter was approaching and there was a risk of bad weather / frozen ground.
23 June 2010
SECRET
---
## Area-82 was still just a good idea
23 June 2010
SECRET
---
## Then came the Minefield
* Space available on Area 82 – if we don't mind it being in a minefield.
* Oh, and by the way - there is a 500lb unexploded bomb in the middle of it.....
* Souter not an option
* Area-82 becoming a building site
* Still in containers
```
02/23/2009
```
23 June 2010
SECRET
---
## Then came the data centre move
* RT-RG moving into new data centre so our plans delayed once more
* Space available for our racks and plans to clear the minefield are drawn up
23 June 2010
SECRET
---
## Area-82 was also changing fast
```
SMO
Afghan campaign
BAGRAM AIRFIELD
A-ROCC
Afghanistan
Remote Operations Cryptologic Center
RT-RG
Building
Billeting --Living Pods
Billeting --Living Pods
EITS
IT Services
Building
Billeting --Living Pods
NGA
NGA
Office
Warehouse
Primary Power Feeder 16
UDAEUS
HF/DF
ANTENNA ARRAY
Red Ridge Antenna
Proposed 2nd
Power Feeder
15
AREA 82
AIR FORCE
NGA
SATELLITE FARM
72 ANTENNAS
NRO
242.2 | 25.6 207 145.3
PP
(2) GCHQ 3.8 M
ACCESS ROAD
GCHQ ET ALL
ANTENNA NUMBERS
AND PLACEMENTS ARE
```
23 June 2010
SECRET
---
## "The Minefield is Cleared"
* All we needed was a volunteer to go check out this rumour
[REDACTED]
02/24/2008
23 June 2010
SECRET
---
## Then the other guests turned up
* First the AROCC build started
* Then RED RIDGE appeared in the antenna field
* Then Liberty.....
* Then NRO.....
* Then NGA.....
* Then USAF....
* Let the party begin.
* Who pays?
* How do we design the layout?
* Any more partners? Have we enough power?
* Winter was approaching again - along with the risk.
* Do we want temporary space on top of the toilets?
02/24/2008
23 June 2010
SECRET
---
## Another Survey is needed
02/24/2008
But the Bagram Hilton is overbooked that night...
23 June 2010
SECRET
---
## Progress was being made
2009/11/25
We finally have our very own hole!!
23 June 2010
SECRET
---
## Quite Quickly by this point...
2009/12/03
Which soon started to look like something we could use
23 June 2010
SECRET
---
## Finally the Build Begins
[REDACTED]
Afghan technology is deployed to complete the ground works
23 June 2010
SECRET
---
## No Expense is Spared
[REDACTED]
Only the best equipment is used
23 June 2010
SECRET
---
## Meanwhile, back with ITServices
2009/11/20
We managed to get our hands on a plane!!
23 June 2010
SECRET
---
## Somewhere is Sunny Afghanistan
2010/02/08
Not quite the 46° that had been promised
23 June 2010
SECRET
---
## C&W were building the Dishes
2010/01/28
One man and his power tools :)
23 June 2010
SECRET
---
## Whilst in a warm(er) data centre
2009/12/02
GCHQ
2009/12/02
All those wires needed putting back in the right place
23 June 2010
SECRET
---
## And finally it all came together
[REDACTED]
2010/02/10
A well earned photo opportunity for the team
23 June 2010
SECRET
---
## RT-RG Deploys
* Same 5 rack solution that we started with 18 months earlier
* 3/ 4 spoke sites configured at IOC
* Final desktop issues resolved and so far the deployment has been a big success.
We Are Here
23 June 2010
SECRET
---
## Area 82 today
Very different from when we started 18 months ago
23 June 2010
SECRET