# Bagram - Area 82
|
||||
The Story So Far.....
|
||||
|
||||
23 June 2010
|
||||
SECRET
|
||||
|
||||
---
|
||||
|
||||
## Introduction
|
||||
|
||||
* [REDACTED] (GREMIO ASI PM)
|
||||
* Technical delivery by IT Services with help from C&W
|
||||
* This is a summary of how we got there, including:
|
||||
* 2 winters (neither really happened)
|
||||
* 5+ external partners
|
||||
* 1 minefield with added bomb and
|
||||
* 1 toilet block
|
||||
|
||||
23 June 2010
|
||||
SECRET
|
||||
|
||||
---
|
||||
|
||||
## Why did we build this facility?
|
||||
* GCOs wanted access to RT-RG
|
||||
* RT-RG was based at Bagram Airfield and effective access required:
|
||||
* Single satellite hop connectivity
|
||||
* Requiring A new in theatre network
|
||||
* Requiring In-theatre peering with NSA
|
||||
|
||||
RT-RG: REAL-TIME
|
||||
REGIONAL GATEWAY
|
||||
Bagram Airbase, Afghanistan - AF1
|
||||
RT
|
||||
|
||||
23 June 2010
|
||||
SECRET
|
||||
|
||||
---
|
||||
|
||||
## Where we started
|
||||
|
||||
* Container based solution at Souter
|
||||
* Fit a peering point into 1 container (5 racks)
|
||||
* Try to link this all to RT-RG at Bagram
|
||||
* Winter was approaching and there was a risk of bad weather / frozen ground.
|
||||
|
||||
23 June 2010
|
||||
SECRET
|
||||
|
||||
---
|
||||
|
||||
## Area-82 was still just a good idea
|
||||
|
||||
23 June 2010
|
||||
SECRET
|
||||
|
||||
---
|
||||
|
||||
## Then came the Minefield
|
||||
|
||||
* Space available on Area 82 – if we don't mind it being in a minefield.
|
||||
* Oh, and by the way - there is a 500lb unexploded bomb in the middle of it.....
|
||||
* Souter not an option
|
||||
* Area-82 becoming a building site
|
||||
* Still in containers
|
||||
|
||||
```
|
||||
02/23/2009
|
||||
```
|
||||
|
||||
23 June 2010
|
||||
SECRET
|
||||
|
||||
---
|
||||
|
||||
## Then came the data centre move
|
||||
|
||||
* RT-RG moving into new data centre so our plans delayed once more
|
||||
* Space available for our racks and plans to clear the minefield are drawn up
|
||||
|
||||
23 June 2010
|
||||
SECRET
|
||||
|
||||
---
|
||||
|
||||
## Area-82 was also changing fast
|
||||
|
||||
```
|
||||
SMO
|
||||
Afghan campaign
|
||||
BAGRAM AIRFIELD
|
||||
A-ROCC
|
||||
Afghanistan
|
||||
Remote Operations Cryptologic Center
|
||||
RT-RG
|
||||
Building
|
||||
Billeting --Living Pods
|
||||
Billeting --Living Pods
|
||||
EITS
|
||||
IT Services
|
||||
Building
|
||||
Billeting --Living Pods
|
||||
NGA
|
||||
NGA
|
||||
Office
|
||||
Warehouse
|
||||
|
||||
Primary Power Feeder 16
|
||||
UDAEUS
|
||||
HF/DF
|
||||
ANTENNA ARRAY
|
||||
Red Ridge Antenna
|
||||
Proposed 2nd
|
||||
Power Feeder
|
||||
15
|
||||
AREA 82
|
||||
AIR FORCE
|
||||
NGA
|
||||
SATELLITE FARM
|
||||
72 ANTENNAS
|
||||
NRO
|
||||
242.2 | 25.6 207 145.3
|
||||
PP
|
||||
(2) GCHQ 3.8 M
|
||||
ACCESS ROAD
|
||||
GCHQ ET ALL
|
||||
ANTENNA NUMBERS
|
||||
AND PLACEMENTS ARE
|
||||
```
|
||||
|
||||
23 June 2010
|
||||
SECRET
|
||||
|
||||
---
|
||||
|
||||
## "The Minefield is Cleared"
|
||||
|
||||
* All we needed was a volunteer to go check out this rumour
|
||||
|
||||
[REDACTED]
|
||||
02/24/2008
|
||||
|
||||
23 June 2010
|
||||
SECRET
|
||||
|
||||
---
|
||||
|
||||
## Then the other guests turned up
|
||||
|
||||
* First the AROCC build started
|
||||
* Then RED RIDGE appeared in the antenna field
|
||||
* Then Liberty.....
|
||||
* Then NRO.....
|
||||
* Then NGA.....
|
||||
* Then USAF....
|
||||
* Let the party begin.
|
||||
* Who pays?
|
||||
* How do we design the layout?
|
||||
* Any more partners? Have we enough power?
|
||||
* Winter was approaching again - along with the risk.
|
||||
* Do we want temporary space on top of the toilets?
|
||||
|
||||
02/24/2008
|
||||
|
||||
23 June 2010
|
||||
SECRET
|
||||
|
||||
---
|
||||
|
||||
## Another Survey is needed
|
||||
|
||||
02/24/2008
|
||||
But the Bagram Hilton is overbooked that night...
|
||||
|
||||
23 June 2010
|
||||
SECRET
|
||||
|
||||
---
|
||||
|
||||
## Progress was being made
|
||||
|
||||
2009/11/25
|
||||
We finally have our very own hole!!
|
||||
|
||||
23 June 2010
|
||||
SECRET
|
||||
|
||||
---
|
||||
|
||||
## Quite Quickly by this point...
|
||||
|
||||
2009/12/03
|
||||
Which soon started to look like something we could use
|
||||
|
||||
23 June 2010
|
||||
SECRET
|
||||
|
||||
---
|
||||
|
||||
## Finally the Build Begins
|
||||
|
||||
[REDACTED]
|
||||
Afghan technology is deployed to complete the ground works
|
||||
|
||||
23 June 2010
|
||||
SECRET
|
||||
|
||||
---
|
||||
|
||||
## No Expense is Spared
|
||||
|
||||
[REDACTED]
|
||||
Only the best equipment is used
|
||||
|
||||
23 June 2010
|
||||
SECRET
|
||||
|
||||
---
|
||||
|
||||
## Meanwhile, back with ITServices
|
||||
|
||||
2009/11/20
|
||||
We managed to get our hands on a plane!!
|
||||
|
||||
23 June 2010
|
||||
SECRET
|
||||
|
||||
---
|
||||
|
||||
## Somewhere is Sunny Afghanistan
|
||||
|
||||
2010/02/08
|
||||
Not quite the 46° that had been promised
|
||||
|
||||
23 June 2010
|
||||
SECRET
|
||||
|
||||
---
|
||||
|
||||
## C&W were building the Dishes
|
||||
|
||||
2010/01/28
|
||||
One man and his power tools :)
|
||||
|
||||
23 June 2010
|
||||
SECRET
|
||||
|
||||
---
|
||||
|
||||
## Whilst in a warm(er) data centre
|
||||
|
||||
2009/12/02
|
||||
GCHQ
|
||||
2009/12/02
|
||||
All those wires needed putting back in the right place
|
||||
|
||||
23 June 2010
|
||||
SECRET
|
||||
|
||||
---
|
||||
|
||||
## And finally it all came together
|
||||
|
||||
[REDACTED]
|
||||
2010/02/10
|
||||
A well earned photo opportunity for the team
|
||||
|
||||
23 June 2010
|
||||
SECRET
|
||||
|
||||
---
|
||||
|
||||
## RT-RG Deploys
|
||||
|
||||
* Same 5 rack solution that we started with 18 months earlier
|
||||
* 3/ 4 spoke sites configured at IOC
|
||||
* Final desktop issues resolved and so far the deployment has been a big success.
|
||||
|
||||
We Are Here
|
||||
|
||||
23 June 2010
|
||||
SECRET
|
||||
|
||||
---
|
||||
|
||||
## Area 82 today
|
||||
|
||||
Very different from when we started 18 months ago
|
||||
|
||||
23 June 2010
|
||||