first commit
This commit is contained in:
commit
0d90363116
6510 changed files with 679146 additions and 0 deletions
78
data/MHS-collection-assets/MHS-collection-assets.md
Normal file
78
data/MHS-collection-assets/MHS-collection-assets.md
Normal file
|
|
@ -0,0 +1,78 @@
|
|||
TOP SECRET//COMINT/TALENT KEYHOLE//REL TO USA, AUS, GBR
|
||||
|
||||
SIDtoday
|
||||
|
||||
January 2009
|
||||
|
||||
(S//SI//REL TO USA, FVEY) Two New Collection Assets to Greatly
|
||||
Expand MHS Target Coverage
|
||||
|
||||
By: (U//FOUO) [REDACTED], Menwith Hill Station (F77)
|
||||
|
||||
(TS//SI/TK//REL) Menwith Hill Station will accept two new satellites in 2009 – an
|
||||
ORION spacecraft [REDACTED] and a NEMESIS spacecraft [REDACTED]. The arrival of these new
|
||||
vehicles will give MHS greater flexibility in missions, surveys, and signals development
|
||||
efforts and provide opportunities for collection, discovery, and sharing. [REDACTED] will also
|
||||
provide the Intelligence Community with an opportunity to use Overhead in a non-
|
||||
traditional way for a FORNSAT SIGDEV mission.
|
||||
|
||||
(S//TK//REL) [REDACTED]
|
||||
(TS//SI/TK//REL) [REDACTED] currently has a launch date of 13 January 2009. After launch,
|
||||
Alice Springs Mission Ground Station will control [REDACTED] as it deploys and drifts
|
||||
westward, with MHS gaining control 59 days later.
|
||||
|
||||
(TS//SI/TK//REL) [REDACTED]'s initial mission is a
|
||||
survey of the People's Republic of China (PRC)
|
||||
line-of-sight microwave towers and emitters.
|
||||
[REDACTED] will survey the area drifting from [REDACTED]
|
||||
east for approximately 30-45 days. At [REDACTED]
|
||||
east, [REDACTED] will pick up its new primary mission
|
||||
from [REDACTED]: Thuraya collection and
|
||||
Afghanistan/Pakistan exfiltration.
|
||||
|
||||
(TS//SI/TK//REL) After spacecraft [REDACTED] transfers
|
||||
the Thuraya mission to [REDACTED] will drift 0.1
|
||||
degree a day west, continuing the PRC survey for
|
||||
approximately 200 more days. After completion of
|
||||
the PRC survey, [REDACTED] will take on a new mission
|
||||
targeting Latin America, Middle East and North
|
||||
Africa, greatly expanding MHS's target and
|
||||
coverage area.
|
||||
|
||||
(S//TK//REL) MHS will perform testing
|
||||
and verification before putting the
|
||||
spacecraft into full operations. If the
|
||||
current launch date stands, [REDACTED] will
|
||||
be fully operational sometime around
|
||||
mid May 2009. (Click HERE for larger
|
||||
image.)
|
||||
|
||||
TOP SECRET//COMINT/TALENT KEYHOLE//REL TO USA, AUS, GBR
|
||||
TOP SECRET//COMINT/TALENT KEYHOLE//REL TO USA, AUS, GBR
|
||||
|
||||
(S//TK//REL) [REDACTED]
|
||||
(TS//SI/TK//REL) Currently, [REDACTED] has a launch date of 11 April 2009. [REDACTED]'s
|
||||
mission will be Foreign Satellite (FORNSAT) collection from space – targeting
|
||||
commercial satellite uplinks not normally accessible via
|
||||
conventional means. [REDACTED] will provide the Office of
|
||||
FORNSAT a “site in the sky” when denied a site on the ground
|
||||
for collection. Ground processing equipment is being put in
|
||||
place at MHS that can cover both drift/dwell and sustained
|
||||
collection.
|
||||
|
||||
(TS//SI/TK//REL) The arrival of [REDACTED] and [REDACTED] at MHS
|
||||
will open up new opportunities for discovery and will enhance
|
||||
collection efforts for the intelligence community into areas not
|
||||
previously explored.
|
||||
|
||||
(S//TK//REL) MHS expects to
|
||||
have full operations on [REDACTED]
|
||||
85 days after launch. (Click
|
||||
HERE for larger image.)
|
||||
|
||||
(U//FOUO) POC: [REDACTED]
|
||||
|
||||
(U//FOUO) SIDtoday Editor's note: This article is reposted from MHS's Horizon newsletter,
|
||||
November 2008 edition.
|
||||
|
||||
TOP SECRET//COMINT/TALENT KEYHOLE//REL TO USA, AUS, GBR
|
||||
Loading…
Add table
Add a link
Reference in a new issue