first commit
This commit is contained in:
commit
0d90363116
6510 changed files with 679146 additions and 0 deletions
|
|
@ -0,0 +1,20 @@
|
|||
TOP SECRET STRAP1
|
||||
|
||||
TALIS Phase 2 Test & TTO Plan
|
||||
|
||||
SMO/00007CPO/4524/P02003/000/05
|
||||
|
||||
18 September 2009
|
||||
|
||||
3.6 A5/3 crypt attack proof-of-concept demonstrator
|
||||
|
||||
3.6.1 Scope
|
||||
To successfully prosecute A5/3 enciphered GSM air-interface intercept requires changes to each part of the current A5/1 processing chain. This is a new requirement and has the covername of OPULENT PUP.
|
||||
|
||||
3.6.2 Requirements & Acceptance Criteria
|
||||
|
||||
RFC ST1823
|
||||
|
||||
| Identifier | CmR | Acceptance Criteria | Notes |
|
||||
|:------------------|:---------------------------------|:------------------------------------------|:------|
|
||||
| S-SMP_CmR-xxxx | Trial A5/3 crypt attack hardware | Revalidated IA for OPULANT PUP RFC ST1823 | |
|
||||
Loading…
Add table
Add a link
Reference in a new issue